    21 May 2014 Minutes from the ISOLDE Physics Group Meeting May 21, 2014 No comments to the minutes from the ISOLDE Physics Group Meeting on May 15, 2014. TECHNICAL NEWS: – The GPS front-end and separator are in good state. The entire system is under vacuum and a dummy target, required for stable beam and

    Explore →

  • 15 May 2014

    15 May 2014 Minutes from the ISOLDE Physics Group Meeting May 15, 2014 Comments to the minutes from the ISOLDE Physics Group Meeting from May 8, 2014: – “Currently the RILIS machine protection system is being tested and it seems to work correctly. This system will allow for remote work of the RILIS team during

    Explore →

  • 7 May 2014

    7 May 2014 Minutes from the ISOLDE Physics Group Meeting May 7, 2014 No comments to the minutes from the ISOLDE Physics Group Meeting from April 30, 2014. TECHNICAL NEWS: – The vacuum problems with the HRS front end have been solved and this area is being pumped down now. – The ISCOOL is also

    Explore →

  • 30 April 2014

    30 April 2014 Minutes from the ISOLDE Physics Group Meeting April 30, 2014 No comments to the minutes from the ISOLDE Physics Group Meeting from April 16, 2014. TECHNICAL NEWS: – A new 24V power supply has been installed in the ISOLDE control room. It will be available for users and it will serve for

    Explore →

  • 16 April 2014

    16 April 2014 Minutes from the ISOLDE Physics Group Meeting April 16, 2014 No comments to the minutes from the ISOLDE Physics Group Meeting from April 3rd, 2014. TECHNICAL NEWS: – Black powder-like dust is distributing around the ISOLDE hall. Most likely this is connected to the open windows towards the new bld. 508. –

    Explore →

  • 3 April 2014

    3 April 2014 Minutes from the ISOLDE Physics Group Meeting April 3rd, 2014 No comments to the minutes from the ISOLDE Physics Group Meeting from March 27th, 2014. TECHNICAL NEWS: – Works connected to the water station located behind the control room are still on-going. The water should be available in the hall as of

    Explore →

  • 27 March 2014

    27 March 2014 Minutes from the ISOLDE Physics Group Meeting March 27, 2014 No comments to the minutes from the ISOLDE Physics Group Meeting from March 20th, 2014. TECHNICAL NEWS: – Separation of 20°C and 27°C water systems has been done. Acceptance test and commissioning are ongoing. – The overhead crane is currently unavailable due

    Explore →

  • 20 March 2014

    20 March 2014 Minutes from the ISOLDE Physics Group Meeting March 20, 2014 No comments to the minutes from the ISOLDE Physics Group Meeting from March 13th, 2014. TECHNICAL NEWS: – Tubing for 20°C water from bld. 199 to HIE-ISOLDE is ongoing. – There are still some connections between mixed water to be finished. –

    Explore →

  • 13 March 2014

    13 March 2014 Minutes from the ISOLDE Physics Group Meeting March 13, 2014 No comments to the minutes from the ISOLDE Physics Group Meeting from March 6th, 2014. TECHNICAL NEWS: – The drilling on the Saleve side of the hall will continue in order to fix the tubes for the 20 degree cooling water from

    Explore →

  • 6 March 2014

    6 March 2014 Minutes from the ISOLDE Physics Group Meeting March 6, 2014 No comments to the minutes from the ISOLDE Physics Group Meeting from January 27th, 2014. TECHNICAL NEWS: – RFQ is back in the hall. – it will stay for a moment in the IDS area. – Ramses (RP system) cabling for GPS