Category: Physics Group Meeting Minutes
-
10 September 2014
10 September 2014 Minutes from the ISOLDE Physics Group Meeting September 10, 2014 No comments to the minutes from the ISOLDE Physics Group Meeting on September 4, 2014. TECHNICAL NEWS: GPS: – UC2 target with the neutron converter was unable to produce enough Mn for SSP and IDS. High contamination of stable Rb from a
-
2 September 2014
2 September 2014 Minutes from the ISOLDE Physics Group Meeting September 4, 2014 Comments to the minutes from the ISOLDE Physics Group Meeting from August 21, 2014: – ISOLTRAP run description should be rephrased to: The team performed about 50% of the program in much less than the allocated beam time in spite of the
-
27 August 2014
27 August 2014 Minutes from the ISOLDE Physics Group meeting on August 27, 2014 No comments to the minutes from the ISOLDE Physics Group Meeting on August 20, 2014. Technical news: GPS: – Lead target installed in the GPS. It’s 2 years old but expected to behave nicely. – The Slovak team started using this
-
21 August 2014
21 August 2014 Minutes from the ISOLDE Physics Group Meeting August 14, 2014 No comments to the minutes from the ISOLDE Physics Group Meeting from January 13, 2014. TECHNICAL NEWS: GPS: – ISOLTRAP took stable beam over the weekend. – On Monday morning, August 18, several successful clamping tests were performed with target #507. In
-
13 August 2014
13 August 2014 TECHNICAL NEWS – GPS: • Still the Ta target on. Currently being used by IDS for stable and radioactive beam tests (until Thursday morning, Aug 14). • PSB still has problems delivering the nominal 3•1013 protons per pulse (ppp); it is presently several 1012. • The line/target heating and HV were dropping
-
31 July 2014
31 July 2014 Minutes from the ISOLDE Physics Group Meeting July 31, 2014 TECHNICAL NEWS – GPS: • First proton scan done (on the SEM-grid) on Friday, July 25 and during the weekend. • First Ta target for physics experiments was installed on Tuesday, July 29. This target will serve for the production of medical
-
3 July 2014
3 July 2014 Minutes from the ISOLDE Physics Group Meeting July 3, 2014 No comments to the minutes from the ISOLDE Physics Group Meeting on June 27, 2014. TECHNICAL NEWS: – GPS separator: is in operational state, at the moment delivering beam to RILIS for the laser development tests. Most critical thing remaining is the
-
19 June 2014
19 June 2014 Minutes from the ISOLDE Physics Group Meeting June 19, 2014 No comments to the minutes from the ISOLDE Physics Group Meeting on June 12, 2014. TECHNICAL NEWS: – GPS: generally in a good state. The separator is running. RILIS laser tests on Ba beam are on-going. More RILIS tests still to be
-
12 June 2014
12 June 2014 Minutes from the ISOLDE Physics Group Meeting June 12, 2014 No comments to the minutes from the ISOLDE Physics Group Meeting on May 28, 2014. TECHNICAL NEWS: – GPS and HRS front ends are now almost completed, with only minor work still to be done. The Faraday cages in both front ends
-
28 May 2014
28 May 2014 Minutes from the ISOLDE Physics Group Meeting May 28, 2014 No comments to the minutes from the ISOLDE Physics Group Meeting on May 15, 2014. TECHNICAL NEWS: – Lots of work going on in the target area. The major things that still have to be done include: commissioning of the robots, ventilation