• GPS

  • The week was shared between collections for medical purposes/bio physics and beam development with RILIS/ISOLTRAP. Target # 565 Ta performed well.
  • Last week’s operation was smooth although the problem with switching off of different electrostatic elements (CA0) persisted. On a couple of occasions this could be correlated to a vacuum glitch but otherwise their powering off seemed to be random.
  • On Wednesday evening the power in the electrical cupboard with the GPS/HRS power supplies tripped due to an imbalanced distribution.
  • The lack of beam diagnostics in the vertical plane makes setting up the machine difficult.
  • Target #611 UC2-C was installed on Monday for 94Rb beam to Miniball. During the installation there was a problem with the robot which picked up the target in a wrong way, requiring manual intervention.
  • There will be a technical stop on 18th and 19th September.

HRS

  • Ni beams were available for COLLAPS from the end of the week. Earlier in the week, stable surface ionized beams could be used for setting up.
  • The power supply of QP330 was broken and exchanged.
  • On Tuesday night there was a problem with the transmission through the cooler which suddenly dropped and which could only be restored by changing the high voltage on the cooler by 10V. The same problem occurred later in the night, but was self-restored after few minutes. This problem is not understood but was not seen later on in the run. o When putting protons on target, note that it is not possible to send 0A to the last dipoles in the BTY line as in reality this results in 40 A being sent. The solution is to send 0.01A.
  • At LA2, the plan was to install prototype scanners which should replace the wire scanners throughout ISOLDE. Unfortunately, the scanners were 1 mm too big and the installation was postponed.

• REX/HIE ISOLDE

  • On Tuesday, there was an intervention to investigate the water flow meter problems which were experienced in the last weeks.
  • For the first time, all superconducting cavities will be running together for the run on 94Rb23+.
  • With a beam energy of 6.3 MeV/u, it will be the highest energy beam at which HIE-ISOLDE has operated so far.

RILIS

  • It has been a busy week for RILIS providing Dy schemes for collections in the night while alternating between Sc, Se and Ti schemes for TISD during the day. Although difficulties in producing and measuring Ti and Se beams were encountered, the Sc beams were quite successful with measurements being done on 46-50Sc.
  • Due to a delay in the preparation for collections on Wednesday night and a misunderstanding in the planning, the switchover to Ni could not be done until Thursday evening. Due to a lack of time, the Ni scheme, using the green laser, was not optimized. On Saturday, the green laser was swapped with the TiSa laser and, with some fine tuning by B. Marsh, a clear improvement of a factor of 10 could be gained.
  • The two photon spectroscopy initially planned had to be postponed due to the inability to operate the designated TiSa laser in the RILIS lab.

Physics

• Collections

for

medical

purposes

and

biophysics

went

well.

– The samples are shipped to various institutes, we will still have to wait a couple of weeks for the outcome.

– The new chamber and procedures for collections worked well. This promises an active medical program next year.

– 172Lu and 138Nd were implanted in solutions and foils for PAC measurements for biophysics. In addition 160Ho and 149Gd were also collected, but in a more exploratory manner to test their suitability for future experiments.

• The

COLLAPS

run

on

Ni

experienced

problems

due

to

low

yields.

– The plan was to start with protons on the neutron convertor to study neutron-rich Ni, in particular to remeasure 70Ni and extend the data to 69,71,72Ni. Unfortunately, yields were too low so it was decided to put protons on target to study neutron-deficient 56Ni and 57Ni and to improve the yields of the neutron-rich (with the disadvantage of greatly increasing the Ga contamination).

– While there was a 20 fA RILIS ON/OFF effect on 56Ni during the weekend, no resonance in the hyperfine spectrum could be observed. A check of the beam composition on mass 56 was performed on Tuesday by ISOLTRAP revealing only very little 56Ni (few 100/s), but at that time no RILIS/ON effect was seen anymore.

– The results on 70Ni still need a proper analysis before anything can be concluded. Nevertheless nothing more exotic could even be attempted with these yields.

• Next

week

a

miniball

run

with

94Rb

will

be

preformed

to

study

excited

states

around

212Pb.

– It is expected that using multinucleon transfer reactions 16+ isomers in Mercury isotopes can be populated which weren’t seen in the fragmentation reactions at GSI before.

– It is expected that also a low-lying 3- octupole deformed state in 210Hg will be populated.

• Stable

beams

should

be

delivered

to

VITO

on

Tuesday

for

the

beta-NMR

run

using

Na

in

liquid

samples.

Safety

• RP

and

EP

safety

were

very

happy

with

how

the

collections

went.

The

use

of

the

new,

well-shielded

collection

chamber

resulted

in

a

total

dose

of

only

14

uSv

throughout

the

run.

Visits

• There

will

be

a

visit

of

a

CERN

intern

on

Thursday

14/09.

People

wanting

to

join

for

a

coffee

afterwards

(~15:00)

are

welcome.

AOB

• All

contaminated

material

was

removed

from

the

old

labs/new

offices

in

building

3.

• From

now

on

until

the

end

of

the

year,

the

MEDICIS

interlocks

will

be

tested

as

preparation

for

next

year.

A

new

VISTAR

with

a

box

for

MEDICIS

will

be

released.

• The

preparation

works

on

the

air

conditioning

in

the

ISOLDE

hall

will

start

this

week.

The

crane

might

be

locked

for

this.

• For

the

European

Researcher’s

Night

on

Friday

29th

September,

Karl

is

still

looking

for

volunteers

to

help

representing

ISOLDE

(part)

of

the

event.

French

speakers

are

particularly

encouraged

to

participate.

Minutes

by

H.

Heylen

Date

2017-09-13