31 May 2017

ISOLDE Physics Group Meeting 31/05/2017

This

weeks

meeting

took

place

in

508

to

avoid

the

noise

and

take

advantage

of

the

air

conditioning.

Technical news

• GPS

– GPS

target

was

not

in

good

condition

on

the

offline

separator

and

is

not

ready

for

physics.

– #513

backup

target

was

used

in

its

place

and

the

B

beams

worked

very

nicely.

Users

satisfied

with

the

yields.

– 60

kV

was

not

possible

on

the

target

due,

probably,

to

leaking

dehumidifier.

– Run

was

performed

with

30

kV

instead,

although

not

perfect

was

acceptable

for

IDS

run.

– There

was

a

leak

of

SF6

gas

somewhere

in

the

line

as

the

bottle

went

from

2.0

bar

to

0.2

bar

in

2

days.

This

has

to

be

improved

and

is

being

worked

on.

– At

some

point,

the

target

anode

went

to

OFF

status

but

went

to

white

and

not

red

on

the

control

screens.

– Full

trip

of

target

HV

also

occurred,

but

control

screens

were

frozen

and

still

showed

everything

as

green.

It

was

finally

resolved

manually.

• HRS

– COLLAPS

target

online

on

Monday,

setup

on

Tuesday.

– The

beam

tuning

looked

a

little

strange,

tuning

continued

overnight.

o In

retrospect:

most

likely

due

to

a

disconnected

power

supply

at

the

HRS

front

end.

This

was

only

discovered

w/b

19th

June.

– The

picoammeter

on

FC490

was

exchanged,

but

there

are

still

problems.

• RILIS

– Al

setup

is

ready

and

available.

• Technical stop

– Technical

stop

went

well

and

there

was

not

disruption

to

the

users.

– Access

to

the

dehumidifier

at

GPS

was

the

biggest

intervention.

• REX/HIE

– ToF

issues

because

pulsed

electrodes

have

strange

configuration.

– Alignment

and

smoothing

measurements

due

to

be

completed

on

Thursday.

Data

will

be

analysed

to

see

if

further

intervention

is

required.

– ISS

magnet

stand

to

arrive

next

week

and

surveying

and

drilling

of

holes

to

be

completed.

Magnet

to

be

put

in

place

w/b

12th

June.

– XT03

crane

will

be

installed

at

the

end

of

the

week.

Physics news

• IDS

– 8B

decay

experiment

looking

at

breakup

into

α

particles

and

possible

p+

decay.

– Particle

spectroscopy

setup

was

used

with

DSSSD+pad

detectors

for

Si

telescope

that

surrounds

implantation

point.

– Yields

were

as

expected

in

the

proposal

after

concern

that

they

might

be

much

lower.

– Lots

of

good

data,

showing

indications

of

the

high

transition

of

interest.

– Work

is

now

on

going

to

analyse

the

full

statistics

data

set.

A.O.B.

• Scheduling

– Schedule

is

now

published

until

early

September.

Wk33

still

to

be

negotiated.

• INTC

– INTC

deadline

is

at

5pm,

strictly,

without

exception.

Minutes

taken

by

LPG

Date

2017-05-31