Minutes from ISOLDE Physics Group meeting, 13th July 2016.
No comments to the minutes from the previous PG meeting:
Please read the minutes.
Technical news:
- NOTE: Do not turn off the HT in the control panel. if turn-off completely it takes 45 min to power up again. Only use the stand-by button.
- The “turn off” control button is not needed for the USERS and will soon be removed.
- AUTO-tuner / beam optimiser: Please, when using the programme, add some range restrictions to element values, as the programme can make the values move to extreme. This results in a tuned beam to the setup, but can be quite hard to diagnose along the way e.g. seeing the beam in scanners etc.
- The HRS MAIN beam gate was found to be closed by the manual switch in old control room.
- Please note such an event in the logbook! USERS lost 1h determining the problem.
ISOLDE:
- HRS:
- On Thursday the 90 deg separator magnet had problems, which were solved with a power reset.
- The RFQ/ISCOOL has some problems, which are being investigated by Pascal.
- The fuse on an amplifier keeps blowing.
- A big box of replacement fuses has been put in place in order to keep running until the problem has been cured/understood.
- An intervention is planned.
- Due to communication problems the proton scan was performed on the target, but should only had been on the convertor.
- Clearer instructions will be implemented in the future to avoid this misunderstanding.
- In spite of this happening, it did not cause problems.
- During the proton scan a double peak was observed (has also been observed before) for 142Cs.
- The cause must be the saturation of the detector.
- GPS:
- GPS is running on He-beams for IDS. 8He using the new neutron detector which has been constructed by Miguel.
Earlier in the week there were various target tests from the C-nanotube unit Boron beams were injected into the trap of REX to check for break-up.
- RILIS:
- Was running Sn after Bi.
- For the first time used in all 4 lasers in the on-call mode.
- This operation went smooth.
- Now setting up Radium on HRS – the yields looks promising for CRIS.
- REX/HIE:
- EBIS is working fine.
- The 7-gap amplifier has been included in the security chain of interlocks.
- The 9-gap now turns off when power is too high (safety).
- Status of the cool-down: LHe is in the cavities, but the controls are very sensitive and unstable – the cause is still unknown and the system really has to be monitored.
- It has now been noted that the superconducting solenoid could have a short circuit
- An investigation is in progress and a conclusion is still pending, but more information should be available in a few days.
- This could affect the schedule of the HIE ISOLDE run. Additional low energy physics runs, could be possible. More will be known soon.
- In the case that the module would need to be removed.
- This will affect the beam transmission.
- An investigation is in progress and a conclusion is still pending, but more information should be available in a few days.
- Target:
- The yields from the reused nano-UCx target were good.
- The target for Cd-beam is in good shape.
Physics:
- COLLAPS:
- They measured all the way out to 134Sn.
- Got the data they wanted.
- Yields were acceptable, although 135,136Sn were not seen.
- They measured all the way out to 134Sn.
- He-Run:
- The run is smooth and stable. They got good data. The new neutron detector has been running well.
- CRIS:
- They will run next and want to measure the hyperfine structures of Radium.
Safety:
- INSPECTIONS:
- There were two inspections last week – one for visits and one for b 170.
- No major problems were pointed out.
- There were two inspections last week – one for visits and one for b 170.
- ACCESS:
- The 3 min delay could be removed – but is still being discussed.
- Please, do not leave ISOLDE through the big green gate!
- An alarm is activated every time the gate opens and the video camera is investigated.
- VISITS:
- There will be 24 teachers visiting on Thursday.
AOB:
- Control room:
- Temporary air-conditioning has been installed.
- GLM:
- The background activity was found to be a bit high.
- It was discussed that this could be due to contamination in the stable 40-Argon beam going to IDS. With a half life of some days.
- The background activity was found to be a bit high.
- ENSAR2:
- The next ENSAR2 request has been sent out.
- When applying for ENSAR – Please list all the users and shift for the experiment.
- 508-detector room:
- A swimming pool would be nice with this warm weather – but not when the pool is in the detector room and the water is coming from the air-condition unit!
- Tickets have been made to solve this ASAP.
- A swimming pool would be nice with this warm weather – but not when the pool is in the detector room and the water is coming from the air-condition unit!
Minutes taken by ~TEM