Minutes from ISOLDE Physics Group meeting, 22nd June 2016.
No comments to the minutes from the previous PG meeting:
Please read the minutes.
Technical news:
ISOLDE:
- The strange behaviour last week of the controls all showing green/ok, but elements were actually turned off is still being investigated.
- No obvious reason was found.
- Lefteris is working on a new software that will show real time data, without going through the INCA software layer.
- GPS:
- On Thursday the machine was switched to run negative ion beams.
- The beam elements were sensitive to changes due to the negative charge and a lot of beam tuning was needed to get transmission.
- The Astatine beam was running with some success during the weekend.
- During the switching back the cables of the machine the Hall probe on the GPS magnet was found not to have a well defined fitting position on the magnet.
- Could explain strange mass factors which have been seen recently?
- The machine is back to positive ion beams today.
- HRS:
- RILIS tested with success the extraction of Eu from the leaking UCx target (surface ionised)
- The cool down of the target made the leaking worse and it could not be re-used for the RILIS efficiency test.
- There was an intervention in order to avoid front-end problems (electrode, clamps and shutters).
- This preventive measure will also be added to the GPS later.
- The motor of the HRS robot broke/overheated.
- A “spare” motor will be taken from the identical MEDICIS robot.
- By using this “spare” motor no delays are expected.
- RILIS tested with success the extraction of Eu from the leaking UCx target (surface ionised)
- RILIS:
- They made a better tune and optimisation on Astatine than last run.
- Switching to Bismuth on Thursday.
- REX/HIE:
- 9-gap amplifier is available for beam, some modifications needed for final running conditions for this year, but as it is REX commissioning can continue running the machine in a conservative way.
- There is still no LHe in the two Cryo-modules.
- The cooling and monitoring is performed manually until the cavities are fully cold.
- Taking it slow in order not to stress the recovery line.
- All looks fine during cool down, no leaks.
- Target:
- The last minute target (ThTa foils) produced for the negative ion run performed better than expected.
- The target was further investigated by the target group.
- Target for Bismuth run is ready and to be installed by the robot (with “spare” motor).
- The Pb target is a few days delayed.
- The last minute target (ThTa foils) produced for the negative ion run performed better than expected.
Physics:
- GPS:
- Will be taking Hg-beam for biophysics. 199-Hg binding in proteins.
- HRS:
- Bismuth run: Aim to study the efficiency of beta delayed fission.
- Made systematic studies of the isomers.
Safety:
- VISITS:
- There will be 2 visits this week.
- It has been noted that we are low on helmets at the entrance.
- More helmets will be bought.
AOB:
- INTC:
- You are encouraged to participate at the INTC meeting.
- It will give a broader overview of what is going on at ISOLDE.
- You are encouraged to participate at the INTC meeting.
There will be no ISOLDE PG meeting 29 June 2016 due to the INTC meeting.
Next meeting will be 6 July 2016.
Minutes taken by ~TEM