Minutes from ISOLDE Physics Group meeting, 15th June 2016.
No comments to the minutes from the previous PG meeting:
Please read the minutes.
Technical news:
ISOLDE:
- After the Technical Stop the booster had problems delivering protons for about 6 hours.
- GPS:
- Setting up and on stand-by for negative ion run on the GLM.
- HRS:
- Was running at 40 keV – Neutron rich Indium and Barium beams for IDS.
- The Separator magnet turned off – but again the displayed VISTAR info remained green/ok.
- Beam was lost Friday night around 20:00 – all controls looked fine and green, but…
- RILIS had a look at the target heating and found it was cold.
- Target and beam controls were found to be turned off – The PLC controlling the power supplies was in a “strange error mode”.
- A hardward reset (removing memory cards) was needed to get the system back.
- The TIMBER-log (real time direct data-log for debugging) showed correct data (supplies off) – but the controls showed green and fine.
- Control panels does not show direct data but goes through INCA software layers.
- This will be investigated and if possible to also view the direct feedback.
- 5-6 hours were lost due to this issue.
- During the Barium run the target developed a leak Monday night, that recovered fast without taking protons.
- IDS tried to take as much beam as possible “fighting” the interlocks.
- This is now the 3rd new target in a row leaking after taking protons for some weeks.
- RILIS:
- The TiSa laser had minor problems Tuesday.
- REX/HIE:
- 9-gap amplifiers test is soon done.
- Beam has been sent to the last diagnostic box before the superconducting cryo-module (end of LINAC).
- Delay on cooling the cryo-module, about 2.5 weeks – now cavities at 150 K
- Next is cold gas, then LHe
- 1 week could be re-gained depending on the cooldown.
- Target:
- The leaks on the 3 newly produced targets in a row will be investigated by the target group.
- The new targets were supposed to build up the spare target stock for use as backups; this stock is now very low.
- The target based on last year’s design which was intended for negative ion run, gave bad efficiency, and wouldn’t have been capable of producing sufficient yields for the physics programme
- It was decided to make a new target based on an older design (using LaB6 pellets). This has resulted in a 2 days delay.
- The Bi target unit is almost completed.
- Pb target under construction.
- The leaks on the 3 newly produced targets in a row will be investigated by the target group.
Physics:
- GPS:
- Is getting ready to deliver beams for the negative run - Astatine to GLM, and TISD tests of halogen beams
- HRS:
- IDS had a good run collecting good statistics on the neutron rich In.
- Made systematic studies of the isomers.
- The RILIS team was fast to switch.
- The Barium had a good start but could only run about 2 shifts with low yields due to the target leak.
- Could confirm previous data and can add the data/statistics to a previous run.
Safety:
- 508/labs:
- Please, the labs are not a place for a bike. Bike are forbidden in building 508 and especially in the controlled area. Laboratories in the bottom floor.
- Training/Access:
- Karl gave an exceptional local hands-on training at 508/170 due to no trainers being available.
- VISITS:
- A new IMPACT code has been added for guides.
- Please ask Kara in order to add you to the IMPACT list.
- Remember All visits have to be informed to Alexandre Dorsival and Kara.
- A new IMPACT code has been added for guides.
AOB:
- Discount in restaurants R1 and R2:
- A reduction of 10% is given to students below 25 yr.
- Pick up a discount card from Jenny/EP department.
- A reduction of 10% is given to students below 25 yr.
The next ISOLDE PG meeting will be held on 15 June 2016 followed by a seminar by Stavroula Pallada, "111mCd(II) PAC spectroscopy applied to bacteria metal ion sensor proteins".
Minutes taken by ~TEM