30 March 2016

Minutes from ISOLDE Physics Group meeting, 30th March 2016.

No comments to the minutes from the previous PG meeting: 

Technical news:

There was no technical meeting this week. Only a short report on the ISOLDE status.

ISOLDE:

  • On track for protons to return next week.
  • On Monday there will be the first proton setup on HRS using the SEM grid.
  • The used targets have been moved to ISOLDE as backup units for this year and for test beams.
  • Leak-detector:
    • It is back from repair and has been checked/tested to be working normally.
    • Please read and follow the manual.
    • The key for the leak-detector is located in the TRAKA box.
  • GPS:
    • Separator magnet control was updated to CERN software standard.
      • This update has not been without problems.
      • The magnet is not stable and suddenly resets.
      • The operation feedback is not correctly displayed through the controls.
      • This issue will try to be solved ASAP (this week).
  • HRS:
    • Is on good shape.
    • Will be tested in bunching mode next week. 
    • The updated 1 ms recovery of the HT will be tested.
    •  
  • RILIS:
    • Lasers are in good shape and ready.
    • They are investigating Bismuth ionization.

 

  • Control room:
    • Is now fully operational. The last controls have been installed.
    • Beam gate timing will remain in the old control room, and may be moved next year.
  • 508:
    • The flow of the ventilation system (no AC cooling) was checked.
    • AC cooling will be installed in the DAQ-room – waiting for budget.
      • Maybe also install AC in the control room.

 

  • Target:
    • The target production is on track and within schedule.

 

Physics:

  • Target for COLLAPS will be installed Friday and should be ready for stable beam Monday.

Safety:

  • VISITS:                 
    • The visits route in the Hall was inspected and some issues were found, especially with regard to cleaning up the route which visitors will follow.
    • An action should be made to really clean/move/sort stuff at the experimental areas which is not needed.
      • Reminder: Moving stuff out of ISOLDE now goes through the new buffer zone and can take 1-2 days. Everything, which is taken out of the hall must go through this zone, no exceptions.

AOB:

  • Summer student project:
    • Selections of the students have been made by the algorithm.
    • Waiting for conformation on selected student for project.
    • Please inform Vladimir for the student name and Jenny for the period the student will be at ISOLDE in order to organise a place for the student.
  • ISOLDE newsletter:
    • An extension on the deadline was given until Friday.
    • For the first time there will be a cover page.

 

The next ISOLDE PG meeting will be held on 6 April2016 followed by a seminar of Chloe Malbrunot, "TBA: PIENU".

 

 

Minutes taken by ~TEM