Minutes from ISOLDE Physics Group meeting, 9th March 2016.
No comment to the minutes from the previous PG meeting:
Technical news:
There is still a lot of on-going shutdown work. Getting ready for protons to return and as systems are restarted various debugging is being done.
- ISOLDE:
- The Front-end have two new monitoring systems: one for detecting water leaks and one to measure the conductivity of the water.
- HT supplies have been started.
- Line heating is on.
- The Magnets are cycling, power test (without beam).
- RFQ on HRS to be tested.
- Vacuum system is performing well since the upgrade of the controls.
- The HRS double scanner still needs repair for optimal performance.
- HRS: is in good shape and as ready as possible at current state.
- GPS: Friday morning it was discovered that the HT electrical insulating foils were damaged for still unknown reasons (it was peeling off). The insulating foils were replaced on all three connectors.
- HIE:
- Cryo-module 2 has been installed and aligned. Now working on vacuum.
- The new (and delayed) 9-gap RF power supply has arrived and is being installed.
- The temporary power supply – located beside NICOLE – will stay as backup.
- Cryo-module 1 (repaired) will arrive middle of April.
- REX: Various cryo-pumps have been replaced.
- Control room:
- A few chairs have arrived. Next week the beam control is planned to be installed.
- Control system updated – in case of a power cut, values (e.g. QP-array) should not reset.
- The Operators have been trained for the updated control system.
- RILIS:
- Ready for beam from GPS.
- Test of various schemes such as Bi, Eu and Te until Easter.
- 508:
- Please check if the water installation is done.
- Kitchen is now operational.
- The kitchen has no one responsible for the maintenance.
- Please leave it clean and help keep it clean!
- Target:
- A new glass-material called “Sigradur®” (Glassy carbon) will be tested for Ta target containers.
- Target production is on track and within schedule.
Physics:
- 2016 Beam time schedule has been released and covers until the end of June.
Safety:
- ISOLDE:
- Please wear the mandatory helmet and safety shoes in the hall.
- There was another safety spot check.
- Currently there are three ISOLDE areas of responsibility covered by three different people.
- It is discussed who will take responsibility for the ISOLDE visitors.
- VISITS:
- A new “Token” system has been introduced for CERN access. Each visitor gets a token/chip to be scanned for access.
- How long time will this system take for a group of people to enter ISOLDE through the safety carrousel?
- A new “Token” system has been introduced for CERN access. Each visitor gets a token/chip to be scanned for access.
- 275:
- The work on the new roof has started and it will take 3 weeks.
- 508:
- In the chemical lab. the newly installed shower is leaking. The company behind will be contacted.
- The eye washer is working.
AOB:
- Summer student project:
- 8 projects have been accepted and selected for member state students.
- There will be 2 students from Thailand.
- The student selection has started, deadline 20-MAR-2016 23:59.
- The ISOLDE yield database has been updated.
- 508:
- Please test the phones in the different labs.
The next ISOLDE PG meeting will be held on Wednesday 16th March at 14:00.
There will be a presentation from the three Slovakian students on their work at ISOLDE.
Minutes taken by ~TEM