Minutes from ISOLDE Physics Group meeting, 7th January 2016.
No comment to the minutes from the previous PG meeting:
Technical news:
There was no ISOLDE technical meeting this week.
ISOLDE:
- 4000 L dewar.
- New valves already bought. Now needs to be certified and tested by CERN.
- (followed up by…..)
- An auto delivery system obtained a few years ago was way too expensive (although a new quote may be asked for).
- New valves already bought. Now needs to be certified and tested by CERN.
- He leak detector.
- It needs to be repaired again, before start of beam time.
- Vladimir will make contact the repair company located at SM18 (they made the previous repair 6 month ago).
- It needs to be repaired again, before start of beam time.
- Cleaning campaign around the experimental areas at the ISOLDE hall.
- Monday @ 14:00h
- The Cryo-module is ready to be moved out. Please make sure the space is cleared in the SAS and around.
- The move will take place Friday morning.
- Experimental value of setups (for the 5 year renovation of the ISOLDE MoU) needs to be updated this month.
- The investment per country per experiment needs updating.
- Beam-time request will be advanced this year and it will be soon sent (next week).
- Schedule will be made most probably until middle of August.
275:
- SSP room cleaning/sorting is on-going.
- The leaking roof has been inspected. Mostly leak in the electronic room. Next step is to repair.
- Equipment on floor may need to be shifted in order to access the roof.
508:
- The doors to the workshop on the inside were damaged by a delivery truck (Laura Wehner)
- Will be followed up regarding repair.
- Kitchen still need water connections , The builder ASMIRA (eric@asmira.ch, has contracted “Entreprise Poisson” for the water connections.
Filter for the fume hood. (Maria volunteer to buy it).
- Isolation of emergency doors (sarvadon will start the 20th of January to put the bottom threshold of the doors and DIMENSIONE will do afterwards the isolation.
- Water Circuit for labs, Aziz Amamou will start Monday the 18th.
Safety:
- ISOLDE access:
- Remember to have all the needed courses updated for access. Both hands-on courses are needed for access.
AOB:
- ISOLDE Seminar:
- Please help suggest speakers.
- A seminar/lecture on Nuclear Astrophysics will be given in February by the new Associate.
- INTC proposal deadline 11th Jan at noon.
There will be the next ISOLDE PG meeting at 14:00 the 13. Jan 2016.
Minutes taken by ~TEM