Minutes from ISOLDE Physics Group meeting, 16th December 2015.
No comment to the minutes from the previous PG meeting:
Technical news:
There was no ISOLDE technical meeting this week.
Physics:
- Overall a successful 2015 run for ISOLDE.
- Most of the experiments have gotten very good data.
- Data either to finish studies or as initiating test or preliminary results.
- HIE-ISOLDE:
- The first beam line with MINIBALL and the Coulex chamber was focused in n-rich Zn isotopes moving to the old Rex energies in the evening. The SPEDE start was tested afterwards.
- The second beam line was tested. And the telescopes for the beam diagnostic boxes also.
- ISOLTRAP: Had a few good runs (Cd…and others….).
- COLLAPS: Had good runs and success with Mn beams. They will ask for beam to repeat the less successful Ca beam again in 2016.
- VITO: Beam line is getting new elements and ready to take beam in 2016 into ASPIC.
- IDS: Had many runs and a very successful year. Highlight was the neutron detector successfully installed and dismantled now.
- SSP: Good data have been produced.
- bio-physics did not have any successful runs 2015.
- 2 PhD theses and 1 Master thesis produced from the 2 last years of data.
The groups/experiments at ISOLDE have all benefitted from each other through the strong and good collaboration between colleagues at ISOLDE.
Cleaning campaigns:
- Many campaigns of cleaning through 2015 have been completed. Clean-up has been made at the ISOLDE extension, 508 and 275. Especially large work was done at 275.
- A big Thanks to the many helpers and collaboration on identifying/disposing things.
275:
- RP-team has completed the de-contamination of the SS-lab. The de-classification of the building is on-going.
- The final cleaning of 275 should be done before the end of Jan 2016.
- This should then be the end of a ~3 years of clean-up campaign.
- A new linoleum floor has been ordered for the old SS-lab and reconverted into lab to develop new setups or use as test bench space. The plan is now to have the space to install 3 test stations for equipment before installed at ISOLDE. Please make a request to Maria and Karl indicating the duration period needed in order to make use of the test stations.
- The roof is in a bad shape (water damage). It will be followed up. The same goes for the building heating.
508:
- The Kitchen is installed. Missing water and electricity connections.
- The plan is to install air condition on the top floor in 2016. Maybe not in all the rooms.
- The water flow of the kitchen dispenser has been fixed.
- The damaged sink in the toilet has been cleaned.
- The water circuit installation in the laser-labs will be started 11th Jan.
AOB:
- The ISOLDE Workshop 2015 Group photo turned out very nice and happy.
- Will be distributed online, ISOLDE Workshop page.
- COLLAPS will have a Nature physics publication about Ca-isotope.
There will be the first ISOLDE PG meeting of 2016 next Thursday 07. Jan.
Minutes taken by ~TEM