04 November 2015

Minutes from ISOLDE Physics Group meeting, 4th November 2015.

There were no comments to the minutes from the previous PG meeting last week. 

Technical news:

All in all a good week at ISOLDE with only minor issues. Most focus on HIE-ISOLDE, which had many starts and stops during their first radioactive post-accelerated beam.   

 

  • GPS:
    • Delivering Zn-beam to REX/HIE
    • The possible Li-run has been skipped – will concentrate on only running Zn for as long as possible to recover some of the lost time until shut down.
  • HRS:
    • Lead target installed for run at LA2 for bio-physics. Hg beam collections.
      • Run until Monday.
      • ONLY use STAGISO protons from booster. Max 8x1012 protons per pulse.
    • Friday observed vacuum problems with target. Could not be pumped.
    • 3 different targets could also not be pumped – conclusion front end leaks.
      • Leak came from the broken piston clamping the target (in plastic) on front end. Has been replaced with a new tested piston in metal Tuesday (was planned to be installed during shut-down).
      • About 2 days lost for beam time.
  • RILIS:
    • Reports that all is fine. The Zn-beam is being ionised with fewer problems than had been foreseen. E.g. deterioration of the optics due to the UV 1st step is much less severe than expected
  • HIE:
    • A Faraday cup was replaced in the XT01 line on Friday afternoon. Needed at least 12 hours to re-pump, therefore was done before the weekend.
    • Had many starts and stops setting up and tuning the new machine.
      • Switching between REX and HIE mode.
      • Issues with beam-permit for the Cryo-module – These have since been resolved and REX can run at 2.85MeV/u overnight; HIE-ISOLDE only running for 6 hours per day during the day (not weekends).
    • Monday changed from 74-Zn to 76-Zn.
    • Rescaling problems. They had their first accelerated 76Zn beam for 90 min on Tuesday afternoon

       

Physics:

  • Miniball will continue taking Zn from GPS until shut down.
  • Bio-physics will collect 197Hg (decay to Au) and 199mHg at LA2 from HRS. Implanting into ice and foils.

 

Safety:

  • Waiting for report from RP for decontamination of old SSP lab in b275.
  • The ISOLDE crane is undergoing an upgrade.
    • Check with Erwin before using it, as the controls may be in an intermediate state.
  • Radiation from tunnel has been monitored and checked and nothing to report.

 

AOB:

  • Milestone celebration first radioactive post-accelerated beams of the HIE-ISOLDE project:
    • Glass Box (Restaurant 1) the 10th of November at 16h
    • Please confirm your attendance to Jenny by e-mail, ASAP.
  • HIE/Miniball:
    • A 2 min. of video has been made of the first HIE accelerated beam for the CERN web.
  • INTC meeting open session: Location, building 40 basement, Salle Anderson12th November 13:30.
  • 508: Strange smell in the lower floor corridor is from new plastic curtain in the laser labs.              

The next ISOLDE PG meeting has been announced, and will be Wednesday at 10:45. There will be a seminar from Almudena Arcones, "Nucleosynthesis of heavy elements in supernovae and neutron star mergers".

 

 

Minutes taken by ~TEM