Minutes from ISOLDE Physics Group meeting, 9th September 2015.
There were no comments to the minutes from the previous PG meeting last week.
Technical news:
All in all a good week at ISOLDE with only minor issues.
- ISOLDE:
- The technical stop including software updated went well. Only the VISTAR showed strange behaviour (now fixed).
- The balloons (ISOLDE vacuum recovery) soon need to be emptied.
- The new UCx target for the Mn-run under production, may be 1 day delayed and should be ready Tuesday.
- Two more UCx targets are under production.
- GPS:
- IDS taking beam. Only had smaller issues not important for the run. Still very happy for the beam optimiser (auto tuner), very good transmission.
- Broken scanner SC483 will be replaced/fixed end of September.
- The spare scanner needs to be fixed first.
- IDS had to manually open VAT valves for a short period. For unknown reasons the valves could not be opened by the software. Operator was called to witness the issue.
- HRS:
- ISOLTRAP taking beam.
- There was a leak at the front end. It was from the target and has been replaced/fixed.
- HIE:
- REX beam-line is working on commissioning the beam to HIE. The progress looks good.
- RP monitors/alarms went off due to various tests. No concerns.
- There could be RF-power issues (not enough power) due to the replacement amplifiers being used for the commissioning period.
- RILIS:
- All was good, with many different schemes implemented over the week (Mg, Al, Ba)
- The broken chiller was fixed.
- A new Ba scheme was tested with good result.
Physics:
- IDS: Call it one of their best experiments. Saw what they needed to fulfil proposal on 34Mg and 34Al – Hunting for the +1 isomer of 34Al.
- Had good population with 1-10 c/s.
- Managed also to measure neighbouring isotopes, 35Mg and 36Al.
- ISOLTRAP: Also reports of a good run. 34Mg to 34Al in-trap decay. Hunting for the +1 isomer of 34Al.
- Also measured on 34Si.
- Emission-channelling: Had a short collection to test a new detector using Ø = 1 mm collimator. 20% transmission. Results are good.
Safety:
- 275:
- There was a good/big clean-up of SSP rooms.
- Is now ready for RP to check for contamination, floors/walls.
- Building will be ready for move-in around 1. October
- RP want (ideally) to declassify the building as a radioactive area in the future.
- It will be allowed to use RP sources.
- There was a good/big clean-up of SSP rooms.
AOB:
- New ISOLDE vacuum cleaner is located under the stairs.
- Have been reported to work nicely and performing according to expectations
The next ISOLDE PG meeting has not been announced, and will likely be next Wednesday 9th Sep. at 14:00. There will be both a Summer Student talk and then a seminar from Annika Voss about Laser Spectroscopy - (a selection of) means, methods and measurements.
Minutes taken by ~TEM