Minutes from ISOLDE Physics Group meeting, 10th June 2015.

There were no comments to the minutes from the previous PG meeting last week. 

Technical news

  • HRS
    • IDS did not have a good run. Bad yield of 67-68Mn from the target
    • One more test of the target is ongoing. This target was the one that crashed into the front end.
      • Could be outgassing or the heavy contamination from the Rubidium mass marker.
      • IDS and COLLAPS saw a better yield for fewer protons, which is still not understood.
    • COLLAPS had a good run and a successful collaboration with the RILIS team who provided the laser for optical pumping in the ISCOOL, and completed their program with the exception of 65Mn. 
    • Note that the software has lately displayed the High Voltage as OFF, when it is actually ON. This has to be checked manually.
    • Magnet cycling is not behaving and there are issues, the cycling stops or does not respond.
  • GPS
    • Technical stop planned Monday at 8:00, so GPS will stop at 5:00.

Control system will then also be updated.
Will start up again Tuesday evening.

  • HIE
    • Starting the cryo-module is looking good and is now entering the more critical step of cooling it down.
  • B-508:
    • The 111Cd run is a good test of the new SSP-labs.
    • The chemical fume cupboard is currently being installed.
    • The ventilation system is only an On/Off system not to be regulated (not ideal).
      •  Thursday morning it will be inspected.
    • The LASER labs are now with installed sensitive equipment and closed for any installation work in 508 (without consultation before entering).
    • Phones are working and now with the PIN codes.
    • The open broken door – in progress on repair. LASERS do not seems to be affected by temperature variation from the open door (at the moment).

 

  • Class-A lab is soon online again. This means e.g. that Faraday-cups can be inspected and repaired again.
  • Diagnostic boxes soon to be inspected.
  • Balloons will soon be emptied next week, as they are close to being full.

 

  • VISIT: NO sample removal or opening of chambers during visits:
    • Director of Nuclear Research at Los Alamos, 11 June, 10:30
    • Polish TV, 11 June. 10:30-12:00.

The next ISOLDE PG meeting will be announced, but will likely be next Wednesday. Followed by the seminar of Janne Pakarinen entitled “Nuclear structure studies in Jyväskylä, Finland”

Minutes taken by ~TEM