Minutes from the ISOLDE Physics Group meeting on April 1st, 2015

No comments to the minutes of the PG meeting held last week.

Technical news

  • Progress is being made to deliver beam from targets to experiment beamlines.
  • Pressure reducers to be installed in the magnets were cancelled after calculations showed they were not necessary.
  • An scheduled Power PLC upgrade made software vacuum controls stop working 
  • HRS:
    • The magnet shows an intermittent ‘field error” crash. Under investigation.
  • GPS:
    • The GLM/GHM deflector plates still missed some steps when moved. The motors and clutches were removed and replaced with new redesigned parts. Requires recalibration.
    • Target clamping and unclamping tests successful.
    • Faraday cups FC490 and FC20 show 20% overshoot and undershoot currents when exposed to and removed from beam respectively. Being investigated.
    • Beam scanner 120 seems to have several wires broken. To be repaired.
  • New forklifts will be ordered for ISOLDE hall and B508.
  • ISCOOL:
    • Transmission on continuous mode was observed to steadily decline since first tests this year. Under investigation.
  • RILIS:
    • The optics damaged by the water flooding last week are being slowly replaced. The HRS window is now installed.
  • Schedule:
    • Protons for GPS starting April 9th, HRS the following Monday.
    • The old Pb target for radioactive Hg production is showing ion source problems which could affect exotic isotopes yields. There is a new Pb target ready, though, that could be used.
    • The security patrol to close doors and lock the front end and target area happened Wednesday.
    • Separator course for users starts Tuesday April 7th
  • The work for the independent ventilation system of the MEDICIS building is being finished.
  • The work to pass the B508 signal cables was finished Wednesday.

B508

  • Users are now required to fill an application from their home institutes before they can operate the machines in the workshop. Contact Magda for details.

AOB

-Users request an update of the automatic tuning software. The current situation of the ISOLDE machine does not permit for tests.

-The next meeting will take place at 14:00 Wednesday next week (8st April 2015) followed by a seminar by Jose Bernabeu Alberola on "TIME REVERSAL FOR PEDESTRIANS" (https://indico.cern.ch/event/386138/).

Minutes taken by MMF