Minutes from the ISOLDE Physics Group meeting on February 26th, 2015
No comments to the minutes of the PG meeting held last week.
Technical news
- The HIE-ISOLDE cryomodule will be installed at ISOLDE at the beginning of April.
- The module will be lifted in above the linac tunnel using the overhead crane.
- All boxes in the furthest part of the extension need to be moved before March 10th to leave space to rest the tunnel ceiling’s concrete blocks.
- The pressurized air tubes for the entire hall are being replaced.
- The old turbo pumps at the beamlines are being exchanged. Some of them will not be shipped until later this year, which will me mounted.
- Separator magnet controls:
- The new GPS controls have been installed and will be ready next week.
- The new cycling algorithm for HRS is being tested now.
- High Voltage platform:
- The yearly cleaning of the HV platform room has been completed. The HV supplies were tested to 60 kV successfully.
- The HRS HV supplies were found to recover more slowly, 20-25 ms (instead of 5-8 ms), when set to 60 kV with the neutron converter/MEDICIS targets (during November tests).
- Targets:
- The civil work of the target building ventilation system is on-going.
- The first HRS commissioning target will be installed March 4th. It will be used to define a new alignment point for the frontend.
- The clamping pistons have been fitted with rubber parts that should last for the entire year. New pistons made of radiation-hard parts are being improved and tested for next year.
- GPS yearly maintenance and cleaning is scheduled for March 10th. Call for volunteers.
- RILIS:
- The laser windows for GPS and HRS were changed Wednesday February 25th.
- HIE-ISOLDE:
- Test of the hardware already installed in the linac tunnel scheduled for March 3rd.
- Extraction tests from EBIS planned for mid-next-week. The emittance meter will be installed after the first successful extraction.
- ISCOOL:
- The insulator pieces of the injection and extraction electrodes have been exchanged.
- The group leader suggests finding a solution to make gas N2 available for venting experimental beamlines.
Safety
- The coordinator reminds the group and users to avoid using the ISOLDE worksite for passage (and if necessary to use helmet when passing).
- The open part of the trench by the NICOLE experiment is marked out by a barrier. In order to avoid further accidents it should not be tampered with and not removed.
B508
- All first floor doors have been installed with locks for key SB23 (same as current B275 1st floor).
- Ground floor doors need to be fitted with non-standard size locks. The new keys will be ordered.
Schedule
- The ISOLDE separator course is now going to be held the second week of April, after Easter.
- The first three weeks of March the stable beam will be used for technical teams, RILIS and targets.
- The schedule to be released now will cover beam time until the end of June.
Conferences
- EURORIB to be held in Hohenroda, Germany, on the 7-12 June 2015. Deadline for abstract submission has been extended to March 6th (https://www.gsi.de/eurorib-2015)
INTC-ISCC committees
AOB
-The director of the Instituto Superior Tecnico, Lisbon, will visit the ISOLDE hall and solid state laboratories next Friday.
-The next meeting will take place at 14:00 Wednesday next week (4th March 2015) followed by a seminar by Dinko Atanasov (https://indico.cern.ch/event/377293/).
Minutes taken by MMF